top of page


Open PDF File
:
Cime Caron
Place :
Val Thorens (Dept 73)
Year of production:
2024
Project at 3,200m with numerous constraints (extreme wind, snow, thermal variation, earthquake, supply)
Concrete infrastructure and steel and timber frame structure
Structure supported by over 60 micropiles
Glass curtain wall
Structure connected to cantilevered cable-stayed footbridge
Connected to the existing pedestrian tunnel, this building will house a panoramic terrace, a wine cellar and a bar/restaurant offering 360° panoramic views of Mont Blanc.
B&M Engineering's mission: Project management / Construction studies
Project Gallery






bottom of page