top of page

Open PDF File

:

Cime Caron

Place :

Val Thorens (Dept 73)

Year of production:

2024

  • Project at 3,200m with numerous constraints (extreme wind, snow, thermal variation, earthquake, supply)

  • Concrete infrastructure and steel and timber frame structure

  • Structure supported by over 60 micropiles

  • Glass curtain wall

  • Structure connected to cantilevered cable-stayed footbridge

  • Connected to the existing pedestrian tunnel, this building will house a panoramic terrace, a wine cellar and a bar/restaurant offering 360° panoramic views of Mont Blanc.


B&M Engineering's mission: Project management / Construction studies

Project Gallery

bottom of page