top of page

Search
All Posts


A new project completed! 🏗️🌉
The main deck of the bridge was installed during the night of 27/03 to 28/03, under the closure of the RD1605. The entire structure is in...
May 71 min read
2 views
0 comments


Contribution to the Skyrope project
A new project completed with the participation of B&M Engineering! We thoroughly enjoyed contributing to the Skyrope project through the...
Apr 81 min read
0 views
0 comments


🏔️ A project carried out at an altitude of 3,200 meters 🏗️
B&M Engineering participated in the studies (project management and execution studies) for the metallic, concrete, and wood frameworks of...
Apr 81 min read
1 view
0 comments
bottom of page