top of page
Search


A new project completed! 🏗️🌉
The main deck of the bridge was installed during the night of 27/03 to 28/03, under the closure of the RD1605. The entire structure is in...
May 71 min read


🏔️ A project carried out at an altitude of 3,200 meters 🏗️
B&M Engineering participated in the studies (project management and execution studies) for the metallic, concrete, and wood frameworks of...
Apr 81 min read
bottom of page